Publications

1997
K. Shimizu, Ishizuka, Y., and Bard, J. F., Nondifferentiable and Two-Level Programming, Kluwer Academic Publishers. Boston, 1997. Publisher's Version
1996
T. A. Feo, Bard, J. F., and Holland, S. D., A GRASP for Scheduling Printed Wiring Board Assembly. IIE Transactions on Scheduling & Logistics 28(2), 1996, pp. 155–164.
1995
T. A. Feo, Bard, J. F., and Holland, S. D., Facility Wide Scheduling of Printed Wiring Board Assembly. Operations Research 43(2), 1995, pp. 219–230.
G. Kontoravdis and Bard, J. F., A GRASP for the Vehicle Routing Problem with Time Windows. ORSA Journal on Computing 7(1), 1995, pp. 10–23.
J. F. Bard, Feo, T. A., and Holland, S. D., Reengineering and the Development of a Decision Support System for Printed Wiring Board Assembly. IEEE Transactions on Engineering Management 42(1), 1995, pp. 91–98.
D. J. Crowley, Bard, J. F., and Jensen, P. A., Using Flow Ratio Analysis and Discrete Event Simulation to Design a Medium Volume Production Facility. Computers & Industrial Engineering 28(2), 1995, pp. 379–397.
1994
J. F. Bard, Clayton, R., and Feo, T. A., Machine Setup and Component Insertion for Printed Circuit Board Assembly. International Journal of Flexible Manufacturing Systems 6(1), 1994, pp. 5–31.
J. F. Bard, Shtub, A., and Joshi, S. B., Sequencing Mixed-Model Assembly Lines to Level Parts Usage and Minimize Line Length. International Journal of Production Research 32(10), 1994, pp. 2431–2454.
A. Shtub, Bard, J. F., and Globerson, S., Project Management: Engineering, Technology and Implementation, Prentice Hall, Englewood Cliffs. NJ, 1994. Publisher's Version
1993
J. F. Bard and Graham, A., Developing a Data Collection System for PCB Assembly: A Case Study in Software Engineering. IEEE Transactions on Engineering Management 40(2), 1993, pp. 191–202.
J. F. Bard, Venkatraman, K., and Feo, T. A., Single Machine Scheduling with Flow Time and Earliness Penalties. Journal of Global Optimization 3, 1993, pp. 289–309.
J. F. Bard and H., A., “deSilva and T,” A. Feo, S. D. Wert (1993). Design of Semi-Automated Mail Processing Facilities. {IIE} Transaction on Design & Manufacturing, vol. 25, pp. 88–101, 1993.
T. A. Feo, Bard, J. F., and Holland, S. D., “A Decision Support System for Scheduling PCB Assembly at Texas Instruments,” IIE Operations Research Division Newsletter, vol. XXVIII, 1993.
C. -Y., “Lee,” J. F. Bard, M. Pinedo and W. E. Wilhelm (1993). Guidelines for Reporting Computational Results in {IIE} Transactions. {IIE} Transactions, vol. 25, pp. 121–123, 1993.
1992
J. F. Bard and Moore, J. T., An Algorithm for the Discrete Bilevel Programming Problem. Naval Research Logistics 39 419-435, 1992.
T. A. Edmunds and Bard, J. F., An Algorithm for the Mixed-Integer Nonlinear Bilevel Programming Problem. Annuals of Operations Research 34 149-162, 1992.
J. F. Bard, Dar-El, E., and Shtub, A., An Analytic Framework for Sequencing Mixed Model Assembly Lines. International Journal of Production Research 30(1), 1992, pp. 35–48.
J. F. Bard, A Comparison of the Analytic Hierarchy Process with Multiattribute Utility Theory: A Case Study. IIE Transactions 24(5), 1992, pp. 111–121.
S. B. Graves, Ringuest, J. L., and Bard, J. F., Recent Developments in Screening Methods for Nondominated Solutions in Multiobjective Optimization. Computers & Operations Research 19(7), 1992, pp. 683–694.
1991
J. F. Bard and Feo, T. A., An Algorithm for the Manufacturing Equipment Selection Problem. IIE Transactions 23(1), 1991, pp. 83–92.

Pages