Publications

2013
A. Mobasher, Lim, G., Bard, J. F., and Jordan, V., Daily Scheduling of Nurses in Operating Suites. Chapter 55, 2013, pp. 1217–1241.
2012
Y. Qu and Bard, J. F., A GRASP with Adaptive Large Neighborhood Search for Pickup and delivery Problems with Transshipment. Computers & Operations Research 39(10), 2439–2456, 2012.
A. I. Jarrah and Bard, J. F., Large-Scale Pickup and Delivery Work Area Design. Computers & Operations Research 39(12), 2012, pp. 3102–3118.
J. F. Bard, Gao, Z., Chacon, R., and Stuber, J., Real-time Decision Support for Assembly and Test Operations in Semiconductor Manufacturing. IIE Transactions on Design & Manufacturing 44(12), 1083–1099, 2012.
Y. Shao, Bard, J. F., and Jarrah, A. I., The Therapist Routing and Scheduling Problem. IIE Transactions on Operations Engineering & Analysis 44(10), 2012, pp. 868–893.
A. I. Jarrah, Qi, X., and Bard, J. F., The Destination-Loader-Door Assignment Problem for Cross-Docking Facilities. Working paper, Graduate Program in Operations Research & Industrial Engineering, The University of Texas, Austin, TX, 2012.
2011
A. Mobasher, Lim, G., Bard, J. F., and Jordan, V., Daily Scheduling of Nurses in Operating Suites. IIE Transactions on Healthcare Systems Engineering 1(4), 2011, pp. 232–246.
J. O. Brunner, Bard, J. F., and Kolisch, R., Midterm Physician Scheduling with Flexible Shifts Using Branch-and-Price. IIE Transactions on Operations Engineering & Analysis 43(2), 2011, pp. 84–109.
2010
Y. Deng, Bard, J. F., Chacon, R., and Stuber, J., Scheduling Back-End Operations in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing 23(2), 2010, pp. 210–220.
J. F. Bard and Nananukul, N., A Two-Stage Supply Chain Planning Problem with Inventory Routing. Computers & Operations Research 37(12), 2010, pp. 2202–2217.
J. F. Bard, Jarrah, A. I., and Zan, J., Validating Vehicle Routing Zone Construction Using Monte Carlo Simulation. European Journal of Operational Research 206(1), 2010, pp. 73–85.
J. F. Bard, Deng, Y., Chacon, R., and Stuber, J., Midterm Planning to Minimize Deviations from Daily Target Outputs in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing 23(3), 2010, pp. 456–467.
D. P. Morton, Bard, J. F., and Wang, Y. M., “A Branch-and-Price Algorithm for the Stochastic Generalized Assignment Problem,” in Chapter 7, C. O. : N. R. Developments, Linton, R. F., and Jr, C. T. B., Ed. 2010, pp. 207–236.
J. F. Bard, “Nurse Scheduling Models,” in Topic 4, vol. 5, W. E. O. of Research, Science, M., Cochran, J. J., L. A. Cox, J., Keskinocak, P., Kharoufeh, J. F., and Smith, J. C., Ed. 2010, pp. 3617–3627.
2009
J. O. Brunner, Bard, J. F., and Kolisch, R., Flexible Shift Scheduling of Medical Residents. Health Care Management Science 12(3), 2009, pp. 285–305.
J. F. Bard and Nananukul, N., Heuristics for a Multiperiod Inventory Routing Problem with Production Decisions. Computers & Industrial Engineering 57(3), 2009, pp. 713–723.
J. F. Bard and Nananukul, N., The Integrated Production-Inventory-Distribution-Routing Problem for a Single Commodity. Journal of Scheduling 12(3), 2009, pp. 257–280.
J. F. Bard and Jarrah, A. I., Large-Scale Constrained Clustering for Rationalizing Pickup and Delivery Operations. Transportation Research, Part B: Methodological 43(5), 2009, pp. 542–561.
2008
S. K. Monkman, Morrice, D. J., and Bard, J. F., A Production Scheduling Heuristic for an Electronics Manufacturer with Sequence Dependent Setup Costs. European Journal of Operational Research 187(3), 2008, pp. 1100–1114.
J. F. Bard and Mohan, D. N., Reallocating Arrival Slots during a Ground Delay Program. Transportation Research Part B: Methodological 42(2), 2008, pp. 113–134.

Pages